Update the existing European Train Control System (ETCS) Level 1 on the critical stretch from Budapest to Hegyeshalom at the Hungarian-Austrian border. This modernization undertaking was essential to enable uninterrupted train travel from Budapest to Vienna and allow to operate the full section of railway line 1 as high-speed line with up to 160 km/h.
Challenge

